Odak is local representative of Limitorque -USA actuators in Turkey. We give maintanance and commissioning service also. We just finished eprom replacement job in Elbistan Thermal Power Plant for Mitsubishi Heavy Industries on behalf of Limitorque. Odak fullfills the customer requirements on importing the spare parts and complete actuators as well.
Odak was delivered stainless steel penstocks to Alstom Energy -France for Çan Thermal Power Plant in Turkey.
Odak adapted Limitor electric actuators onto manuel ball and plug valves existed at Kemerkoy Thermal Power Plant site as an order of Babcock and Wilcox -USA
Odak adapted Limitor electric actuators onto manuel egzost dampers existed at Kırıkkale Barmek Gama Power Plant.
Odak recently delivered Limitor Electric Valve Actuators for Velan, Powell and Newco gate valves existing at Bisen Energy Cogeneration Plant in Bursa. The order was received from BWG Babcock Wilcox Gama Boiler Tech.Co.Inc. Adaptation and installation of the actuators was performed by Odak Retrofit Team. Totally 34 pcs of actuators were delivered. Valve sizes were from 6 inch to 20 inch, ratings were from 300 lb to 1500 lb.
ODAK completed the order of various sizes of butterfly and single seat control valves from Siemens AG.
Siemens AG prefered ODAK and Limitor® for his turnkey sugar factory automation projects in Turkey.
ODAK supplied stainless steel oxygen valves in rating DN 300-PN 40 to Isdemir, Iskenderun Iron and Steel Factories Inc.
ODAK recently got the order of various manual and motorized sluice gates from the constructors of Municipalities Bank of Turkey for using water systems.
|